Water Infrastructure Services
Pipeline Utilities Ltd are a leader in the supply and renewal of all underground water assets.
EZ Valve Installations
Pipeline Utilities have invested in our own EZ valve installation installation kit and we are currently working with Water companies to provide a complete installation package for the EZ Valve.
The EZ valve can be installed directly onto a live water main with no loss or disruption to supply with Sizes available for 4"-12" (100mm-300mm), 14" (350mm), 16" (400mm), 20" (500mm) and 24" (600mm).
Bypasses and Diversions
Following plans to widen the A34 in Stafford , this scheme involved installing a Line Stop on a 600mm water main, then diverting the flow by means of a 315mm Bypass while we cut and connected the 600mm steel main onto a new section of 500mm DI that we had laid previously.
Lead Renewals
Following our inclusion on the Green Recovery Scheme for Severn Trent Water in May 2024, we will be commencing work on the Lead Renewal project in Coventry .
This fully funded scheme by STW will provide residents with a completely new water supply from the main in the street to the stop tap with no cost to the resident.
Pipeline Utilities Ltd will be working in partnership with STW to provide inspections, survey and installation .